BUILDER’S TEMPORARY POWER POLES IN MELBOURNE
At Temp Supply we are efficient and very catering for all power needs.
- From 40-amp single phase to 80-amp single phase (depending on what power is required), we cater for all your power needs. We also install 3 phase Builders Temporary Supply for commercial sites.
- We work with you to ensure all safety measures are put in place.
- All builder’s temporary power poles will be inspected by an electrical inspector to comply with the AS 3000 and the Service and Installation rules.
- We not only book through the phone but we do an onsite inspection to assist with any requirements to avoid any delays or disruptions with the distribution power companies.
How It Works
Builder’s Temporary Power Poles In Melbourne
- Call and book an on-site inspection to assist with what power is required.
- With-in 1-3 days a site inspection will be performed.
- Once confirmed a licensed electrician will attend the site to install the pole with the required support.
- An inspection from an Electrical Inspector will be performed and certificate will be in within 48 hours.
- We will assist with the electrical Work Request Form and apply for power with the preferred retailer.