How It Works
3 phase temporary power poles
- Call and book an on-site inspection to assist with what power is required.
- Within 1-3 days a site inspection will be performed.
- Once confirmed a licensed electrician will attend the site to install the pole with the required support.
- A Certified Electrical Inspector will perform and inspection within 48 hours.
- We will assist with the electrical Work Request Form and apply for power with the preferred retailer.
- An account will be set-up between the customer and the retailer.
- The Distribution company will attend the site with-in 4 weeks to connect power.
How Payment Works
- There will be a one-off fee.
- After the power pole is installed there will then be a weekly fee.
- Your Subscription will end, once the temporary power pole is removed by one of our licensed electricians.